INDUSTRIAL + COMMERCIAL(801) 515-3812
RC Coatings
Industrial + commercial flooring

Built for
what happens
on your floor.

Washdowns. Forklifts. Chemical exposure. Production deadlines. Your flooring system starts with the conditions it needs to handle.

Discuss your flooring project
Gray coated processing floor with stainless equipment behind it.
02 / WORKING SURFACESCompleted processing-floor upgrade.RC Coatings project photograph
Watch · 1 min 2 sec

A floor built for what it sees.

See how we assess your floor, prep the concrete, repair cracks and joints, and install a seamless system, phased around production.

Captions are on by default.Book a free floor assessmentMusic: “Soft Corporate” by MusicLFiles, licensed under CC BY 4.0
Read the video transcript

If you run a food plant, a manufacturing line, or a warehouse, your concrete works as hard as your crew.

When it starts to fail, you feel it everywhere. Cracks catch forklift wheels. Dusty concrete gets into product and equipment. Wet, worn spots become slip hazards, and auditors notice.

Wait too long, and a small repair turns into an unplanned shutdown.

We start with a free floor assessment, to see what your floor is up against: hot washdowns, chemicals, heavy traffic, or thermal shock.

Then we mechanically prep the concrete, repair the cracks and joints, and install a seamless system, like urethane cement or epoxy, built for that exposure.

You end up with a durable floor that's easy to clean, with no seams for grime to hide in.

And we phase the work by aisle or room, around your production schedule, so you never shut everything down at once.

Book your free floor assessment below.

From the first call to handover

What to expect
from your flooring project.

A clear scope, an agreed plan, and practical next steps for your facility.

  1. Understand your operation

    Discuss traffic, washdowns, chemicals, cleaning, and the time available for work.

  2. Assess and specify

    Review the substrate and moisture conditions, then define preparation, repairs, system, texture, and details.

  3. Prepare and install

    Coordinate access and isolation, mechanically prepare as specified, repair the substrate, and install the agreed system.

  4. Cure and return to service

    Confirm cure conditions and the approved return-to-service plan, then review cleaning and maintenance needs.

The right system for the environment

Start with the demands.
Then select the floor.

01

Urethane cement

For demanding processing areas where temperature changes, washdowns, and heavy use shape the specification. Thickness, texture, and details are selected for the actual exposure.

Food & beverage · Wet processing
02

Resinous flooring

Epoxy and other resinous systems for manufacturing, warehouses, and commercial spaces. Evaluate chemical resistance, traffic, cleanability, and finish together.

Manufacturing · Warehousing
03

Repairs & upgrades

Address damaged areas, transitions, cove, and drain interfaces as part of a defined repair or upgrade scope. Plan maintenance around the areas that need attention.

Existing facilities · Turnovers
The details do the work

More than
a new surface.

Preparation, drainage details, and return-to-service requirements belong in the same conversation as the coating.

01

Substrate & preparation

Review concrete condition, contamination, existing coatings, and moisture before specifying preparation and repairs.

02

Use & exposure

Define traffic, cleaning procedures, temperatures, chemicals, and the balance between texture and cleanability.

03

Installation & handover

Coordinate access, installation conditions, cure requirements, and the approved return-to-service plan.

For teams responsible for the facility

Keep the next project
focused on the right problem.

Can you install during a weekend shutdown?+

We can evaluate weekend and shutdown windows. Feasibility depends on preparation, repairs, the chosen system, environmental conditions, and cure requirements. Timing is confirmed for the specific project.

Do you work beyond food and beverage?+

Yes. We work with industrial, manufacturing, warehouse, and commercial facility teams as well as food and beverage operations.

Can you address floor slope and drain details?+

We can review slope, transitions, cove, and drain interfaces as part of an assessment. Required corrections and any design requirements are established in the project scope.

Will a new floor guarantee an inspection outcome?+

No contractor can guarantee a facility’s regulatory or customer inspection outcome from a flooring installation alone. We discuss your facility requirements and select the proposed flooring scope accordingly.

Completed flooring projects

See the work.
Understand the result.

Actual project photos and documented outcomes from processing facilities and a bakery conversion.

Start with the building

Tell us what needs
to work better.

A recurring leak. A worn processing floor. A capital project on the horizon. Let’s look at the conditions and the options.

Request a site assessment