Phased processing-floor upgrade
Approximately 12,600 square feet of processing flooring completed in 11 days against a 16-day shutdown allowance, eliminating the final planned shutdown.
Read the case studyFlooring repairs, facility conversions and phased upgrades. See the conditions we found, the work we performed and the results documented on each project.
Customer names and exact locations are withheld for privacy.

Approximately 12,600 square feet of processing flooring completed in 11 days against a 16-day shutdown allowance, eliminating the final planned shutdown.
Read the case study
A deteriorated traffic corridor was rebuilt while coordinating unexpected plumbing work, with the floor returned to service within a Friday-to-Sunday shutdown.
Read the case study
A former automotive repair space received a multi-system flooring package, with decorative office finishes and systems selected for processing, washdown and proofer areas.
Read the case study
The first phase of a six-section restoration program rebuilt deteriorated wall-to-floor transitions around fixed stainless equipment and operating production areas.
Read the case studyA recurring leak. A worn processing floor. A capital project on the horizon. Let’s look at the conditions and the options.