INDUSTRIAL + COMMERCIAL · UTAH & IDAHO(801) 515-3812
RC Coatings
Manufacturing

Keep the line moving. Fix the slab and the roof around it.

Keep the line moving. Fix the slab and the roof around it.

Request an assessment
Resinous floor in a manufacturing plant with yellow safety lines.
Why it matters

Rooftop units over the same floor the forklift beats on.

Manufacturing buildings in Utah and Idaho carry rooftop equipment over a floor that sees oil, point loads, and a schedule. We plan the roof and the resin floor so a shutdown is spent once.

Restoration follows only if the roof is a candidate. Cost planning, including the note that restoration can land near 60 percent of replacement on a suitable roof, is on roof coating cost. That figure is not a quote.

Aerial view of a white-coated commercial flat roof with rooftop equipment.
How it works

Match the line you can spare.

  1. Find the wet roof

    Ponding freezes on the Wasatch and still ices in the Treasure Valley. Scan when stains suggest wet insulation.

  2. Name the slab

    A dry assembly aisle is a different day from a cell that has soaked the concrete for a decade.

  3. Phase or stop

    A phased aisle is often the honest fast-cure project. A full stop is often the honest urethane-cement project.

  4. Keep debris off the line

    Roof work over a running line has to be staged so fasteners do not become a production incident.

Cove base at the edge of an industrial floor
The other half

Utah Valley and the Wasatch

Provo, Ogden, and Salt Lake are where most of this work is planned.

Fast return-to-service options are on fast-cure flooring.

Questions

Questions

Do you name manufacturing clients?+

No. Case studies withhold the customer and the location.

Is urethane cement the manufacturing default?+

No. Oils and point loads do not automatically mean urethane cement. Thermal shock and washdown do.

Can the roof and floor share a shutdown?+

That is the reason to plan them together.

What if the roof is not a restoration candidate?+

We say so, and talk about replacement. See restoration vs. replacement.

Tell us what the line can spare.

Roof, floor, or both. One assessment.

Request an assessment